Belgium 30kW/60kWh C&I Integrated Solar-storage Project

Belgium
2026.3.2
30kW/60kWh
Cube 60
Outdoor Distributed Energy Storage System

Myanmar 500kW/900kWh C&I ESS Project

Yangon, Myanmar
2025.8.9
500kW/900kWh
Cube 1000
Outdoor Distributed Energy Storage System

Middel East 400kW/1024kWh C&I ESS Project

Middel East
2025.12.10
400kW/1024kWh
Cube 128
Outdoor Distributed Energy Storage System

Peru 500kW/900kWh C&I ESS Project

Strategically discharging 400kW daily from 6 - 8 PM (peak rate window), targeting their costliest consumption. This integrated approach saves $6,000 monthly, putting the project on track for a 3-year ROI.




Arequipa, Peru
2025.12.1
500kW/900kWh
Cube 1000
Outdoor Distributed Energy Storage System

Myanmar 125kW/261kWh EV Charging ESS Project

Myanmar
2025.5
125kW/261kWh
Cube 261-Y
Outdoor Distributed Energy Storage System

Myanmar 100kW/120kWh C&I ESS Project

Yangon, Myanmar
100kW/120kWh
Cube 60
Outdoor Distributed Energy Storage System

Middel East 50kW/125kWh C&I ESS Project

Middel East
50kW/125kWh
Cube 125
All-in-One Energy Storage Cabinet

Myanmar Hotel 100kW/215kWh C&I ESS Project

Myanmar, Mawlamyine
2025.7.29
100kW/215kWh
Cube 215
Outdoor Distributed Energy Storage System

Myanmar 100kW/120kWh C&I ESS Project

Myanmar, Meiktila
2025.7.24
100kW/120kWh
Cube 60-S
Outdoor Distributed Energy Storage System

Middel East 50kW/125kWh C&I ESS Project

Middel East
50kW/125kWh
Cube 125
All-in-One Energy Storage Cabinet

Middel East 50kW/60kWh C&I ESS Project

Middel East
50kW/60kWh
Cube 125
All-in-One Energy Storage Cabinet

Myanmar 50kW/60kWh C&I ESS Project

Myanmar
2024.11
50kW/60kWh
Cube 60
All-in-One Energy Storage Cabinet

Suzhou Jingtai Optoelectronics 8.18MW/16.37MWh C&I ESS Project

Expected to save around 6.5 million RMB in annual electricity bills, cut 5,700 tons of carbon emissions. Reduces operating costs, drives green energy transition




Suzhou, China
2025.03
8.18MW/16.37MWh
Cube 372
Energy Storage System

Huizhou 2.3MW/4.6MWh C&I ESS Project

Through peak-valley arbitrage, annual discharge is about 2.6 million kWh, saving enterprises $250,000 in electricity costs yearly, cutting costs effectively, with a payback period within 3.5 years.




Huizhou, Guangdong
2.3MW/4.6MWh
AX 3400, Cube 230,
Cube 232, Cube 215
Energy Storage Systems

Guangdong 1.86MW/3.72WMh C&I ESS Project

With an average annual discharge of around 2.11 million kWh, it saves about $200,000 in electricity costs yearly. The whole project's payback period is within 3.5 years.




Zhongshan, Guangdong
1.86MW/3.72WMh
Cube 200, Cube 230
Energy Storage System

Sichuan 1.84MW/3.68MWh C&I ESS Project

Sichuan, China
2025.03
1.84MW/3.68MWh
Cube 230
All-in-One Energy Storage Cabinet

Dongguan 1.1MW/2.2MWh Metal Manufacturing Factory C&I ESS Project

Dongguan, Guangdong
2023.11
1.1MW/2.2MWh
Cube 200
All-in-One Energy Storage Cabinet

Guangdong 1MW/2MWh C&I ESS Project

Helps enterprises with peak-shaving and valley-filling, discharging about 1.13 million kWh annually, saving them around 740,000 RMB in electricity costs each year. The project pays back within 3.5 years





Huizhou, Guangdong
1MW/2MWh
Cube 200
All-in-One Energy Storage Cabinet

Guangdong 0.92MW/1.92MWh C&I ESS Project

Guangdong, China
2024.12
0.92MW/1.92MWh
Cube 230
Outdoor Distributed Energy Storage System

Jiangsu 575kW/1.15MWh C&i ESS Project

Jiangsu, Changzhou
2024.12.18
575kW/1.15MWh
Cube 230
Outdoor Distributed Energy Storage System

Guangzhou 500kW/1.04MWh C&I ESS Project

Guangzhou, China
500kW/1.04MWh
Cube 261
Outdoor Distributed Energy Storage System

Guangdong 200kW/400kWh C&I ESS Project

Zhongshan, Guangdong
200kW/400kWh
Cube 200
All-in-One Energy Storage Cabinet